Kinsevere solvent-extraction electrowinning plant

Back to case studies

Solvent-extraction electrowinning plant

The existing Kinsevere operation is an open pit mining operation and HMS processing plant with an electricarc furnace located 30 km north west of Lubumbashi, provincial capital of Katanga Province in the Democratic Republic of Congo.

The stage II expansion is a 60,000 t/y capacity SX-EW plant at Kinsevere, to exploit a 34% increase in Measured and Indicated Resources and a subsequent 32% increase in Proven and Probable Mineral Reserves.

Ausenco was initially engaged to design and deliver the 60 000 t/y solvent-extraction electrowinning plant on an engineering, procurement and construction management (EPCM) basis. The project was suspended in December 2008 pending greater stability in world financial markets.

Ausenco was re-engaged in June 2009 for design completion, and again in January 2010 to complete the construction project on an EPC basis.

  • First copper cathode production in May 2011.
  • Safety milestone - achieved two million man hours without a Lost Time Injury (LTI).

Project details

Offering
Hydrometallurgy
Commodity
Copper
Location
Democratic Republic of Congo
Business line
Minerals & Metals
Client
Anvil Mining Limited
Timeframe
2007-2009, 2010-2011
Solution phase
Create (EPC)
Project value
$400m