  • Timeframe2003
  • Solution phaseCreate (EC) Preliminary and detailed design; Construction Management

Increased Capacity and Reliability

Due to the potential for a significant release of water even in a moderate earthquake, the Greater Vancouver Water District (GVWD) decided to reconstruct the Little Mountain Reservoir with increased capacity and enhanced reliability.

Ausenco as the prime consultant led a comprehensive team, including 12 specialist sub-consultants, to carry out the detailed design and construction management.

Sustainability principles were drivers throughout the project, including maximising recycling of demolished materials and use of EcoSmartTM concrete.

The project was a recipient of an APEGBC Sustainability Award, a CEBC Award of Excellence in Municipal Engineering, a national ACEC Award of Excellence, and two concrete related awards.

Key objectives of the project were:

  • New 175 million litre reservoir with 100 year lifespan, resistant to maximum credible earthquake
  • Optimised reservoir capacity, available parkland and overall at optimal cost
  • Improved operational reliability and flexibility
  • Minimised impact to the park, its users, neighbours and environment
  • Roof designed for bus parking and improved landscaping without affecting water quality
  • Principles of sustainability followed throughout