Nahwitti Wind Farm

Back to case studies

Ausenco is currently doing the preliminary engineering to assist Nomis Power to develop a 100 MW wind farm on Vancouver Island.

We have made the application to the British Columbia Transmission Corporation (BCTC) for the generator interconnection preliminary impact study.

We are working with BCTC to resolve the challenges of connecting a significant wind farm to the “weak” electrical transmission system at the northern end of Vancouver Island.

Project details

Offerings
Power generation, Renewable power
Location
Vancouver Island, BC, Canada
Business line
Oil & Gas, Power
Client
Nomis Power Corp.
Solution phase
Innovate
Services
Engineering, Studies and technical solutions