Xstrata Mount Isa Mines operates mining and processing streams for copper and zinclead- silver. The copper operations include two underground copper mines from which 6.2 M/ty of ore is mined, a concentrator with 7.2 Mt/y capacity and a copper smelter. 

Ausenco Rylson was engaged to carry out a risk based criticality analysis and facilitate a PM Optimisation (PMO) program of all copper concentrator assets. 

The project objectives were: 

  • To review the existing plant hierarchy in Ellipse for completeness and accuracy 
  • To conduct a comprehensive criticality analysis of the plant and equipment 
  • To optimise the maintenance strategies for the plant and equipment removing duplication of effort and ensuring all maintenance is value-adding. 

Achievements 

The work completed by Ausenco Rylson at Xstrata’s copper concentrator at Mount Isa yielded the following results:

  • A number of assets were identifi ed as missing from the CMMS (Computerised Maintenance Management System) 
  • A significant number of assets had their details modified to bring them up-to-date in the CMMS 
  • All copper concentrator assets went through a structured PMO process to refine and optimise the maintenance being carried out 
  • Standard Jobs and Maintenance Scheduled Tasks (MST) were developed for all concentrator assets for implementation into the CMMS.

Project details

Offering
Asset management
Location
Queensland, Australia
Client
Xstrata Mount Isa Mines
Timeframe
2007
Solution phase
Optimise