Detailed design of phosphoric acid cooling tower

Ausenco’a scope included the preparation of flowsheets, P&ID’s and control philosophy; detailed engineering design and preparation of equipment specifications; technical evaluations for procurement by the client; and commissioning assistance.

  • Design allowed for highly scaling service
  • Extensive use of FRP piping
  • Large amount of design interface with Phosphoric Acid Plant

Project details

Offerings
Mine and industrial, Mining engineering
Commodity
Industrial minerals
Location
Queensland, Australia
Client
WMC Fertilizers
Timeframe
1999
Solution phase
Create (EPCM)
Project value
A$3m
Services
Engineering, Global procurement, Construction management, EPC/EPCM