Stockyard runway refurbishment project

Back to case studies

Refurbishing stockyard runway

Pacific Coast Terminals (PCT) is a bulk export terminal located at the east end of Burrard Inlet near Vancouver, BC, Canada.

PCT handles sulphur, which is unloaded from railcars by rotary dumper and stored in open stockpiles, and ethylene glycol, which is unloaded on four Rack Tracks and stored in their Tank Farm.

A rail-mounted StakRake (stacker/reclaimer) is used to stockpile and reclaim sulphur from a centre-mounted conveyor to stockpiles on each side of the runway.

The runway is 440 m long and consists of two parallel concrete pedestals with a 135 lb crane rail mounted on each pedestal at a gauge of 7.62 m (25 ft). The existing StakRake runway was in dire need of replacement.The existing rails and fastenings were corroded, the horizontal and vertical alignment was approaching maximum operating limits, and the concrete pedestals were deteriorating due to sulphate attack.

Ausenco provided assistance with EPCM activities for the refurbishment of the existing runway which occurred during two planned shutdowns in 2009 and 2010.

Project details

Offering
Heavy haul rail and transportation systems
Location
Port Moody, BC, Canada
Business line
Process Infrastructure
Client
Pacific Coast Terminals Co. Ltd.
Timeframe
2009 - 2010
Solution phase
Create
Services
Engineering, Global procurement, Construction management, EPC/EPCM