Tail Gas Scrubbing Project

Back to case studies

The plant is located within the Pasminco smelter zinc refinery in Hobart, Tasmania. The project involved the design and construction of a zinc refinery off-gas cleaning system for scrubbing sulphur dioxide from furnace off-gases.

The installation included a salt water intake straining station, contact scrubbing towers, reticulation piping and ductwork.

Ausenco’s scope included:

  • preparation of a definitive capital cost estimate to obtain board approval
  • feasibility study, process development and detailed engineering and preparation of all specifications
  • procurement, inspection and expediting for all equipment
  • preparation and administration of all fabrication and site works contracts
  • site construction management and commissioning assistance of the plant
  • project management and associated cost control, reporting and scheduling.

Due to the potential for corrosive attack, fibreglass materials were used extensively during construction.

Project details

Commodity
Zinc
Location
Hobart, Tasmania, Australia
Business line
Minerals & Metals
Client
Pasminco Hobart Smelter
Timeframe
2000
Solution phase
Create (EPCM)
Project value
US$8m
Services
Engineering, Global procurement, Construction management, EPC/EPCM