Granites Gold project upgrade

Brand:
Ausenco
Client:
Newmont Tanami Operations
Location:
Australia
Commenced:
2003

The Granites Ball Mill Project involved the upgrade of the existing grinding circuit by replacing 3 smaller mills with a single new 5.5m dia x 9.3m EGL, 4.7MW ball mill, 12/10 (355kw) pumps (2 off) extension of the existing feed conveyor, installation of a new bulk caustic storage facility adjacent to the existing bulk cyanide storage facility, a new carbon safety screen near to the tailings thickener, demolition of an existing section of the original CIL plant and relocation of a slurry pump to bypass the tailings thickener.

 