Skytrain Phase 1 - Dunsmuir Tunnel

Project
Skytrain Phase 1 - Dunsmuir Tunnel
Client
BC Transit
Industry Sector
Industrial
Location
Vancouver, Canada
Client
BC Transit
Service Area
Infrastructure; Transportation & Logistics
Solutions
Basic Engineering; Site Planning & Development; Rail & Intermodal

Applying innovation to legacy

Ausenco designed the realignment of the Dunsmuir Tunnel at Stadium Station for Phase 1 of SkyTrain.

The existing tunnel had to be realigned, re-profiled and separated to connect to the new Stadium Station.

The Dunsmuir Tunnel was built in 1931 and was a single line rail structure. The twin SkyTrain tracks are stacked one above the other in the tunnel.

This required the lowering of the tunnel invert to achieve the necessary increase in height.

At the eastern end a re-alignment of the tunnel was required, which resulted in a complete, underground break-out section, twin bored tunnels and a twin reinforced concrete cut and cover box tunnel section.